Monday, November 15, 2010

Building Progress: Second Level Slabs Get Poured

Finally we have half of a second floor slab! I thought the rain would never stop, but it did (although it's started again, I might add) and at the end of last week and on Saturday the guys were able to do this ...


They formed the slab and poured the concrete over the girls' bedrooms, above which will be our bedroom and the study. To the left is the guest bedroom and you can see the frangipani at the front of the property start to bloom. And although you can't see it yet, in the middle will be the stairway linking the two 'wings' (for want of a better word) and the front entrance, which will be set halfway between the two levels.


Hugh has been busy moving mounds of muck but the mound of rubble in front of Amy's bedroom has made the boundary fence start collapsing! Oops! But at least we were going to replace it anyway.


In the far distance, if you squint really hard, you can see the sea!

The next stage now is to do the same on the upper level wing and then the brickies can start building the second storey walls so the whole thing can start to look more like a house!

3 comments:

  1. YAY! Progress, mother nature is certainly slowing you up, heres hoping for a whole lot of sunshine to come!!!

    ReplyDelete
  2. Its been a while since I popped in and so much has happened I hope the weather stays nice for a great lead up to Chrissie.

    ReplyDelete
  3. wow, you're making great progress. hope they keep up the pace! jxx

    ReplyDelete