After not a lot of action, we now have lots happening. I had a site meeting on Friday with the builder-project manager, the architect and his side-kick, an Irish work-experience architect and the foreman, plus four brickies and three other workman working on the site. As the only female there, you could say I felt outnumbered! But it was very exciting to see the old bricks from the original house being laid as part of the reverse brick veneer cladding. Already the outline of the downstairs rumpus room, guest bedroom and ensuite and their window placements are clearly visible. It was amazing to finally get a concrete - so to speak - feel for some of the house and to walk through it. Over the next two weeks, the pool will be formed, more bricks laid and all the dirt next to the concrete slab moved so the second slab can go down. And next time I'll remember to take my camera on site so I can take better pictures - instead of taking them behind the fence after everyone had left for the day like I did here!

The alcove, if you can call it that, in the middle is the guest ensuite.
View through Hugh, the digger.
The concrete block retaining wall on which the second slab will be formed. The rectangular bit sticking out is where the bath in the master ensuite will be, with a window so you can look out at the trees beyond.
My friend, Hugh the digger, takes a rest after a long week's work.
I think I know why I love him so much: his colour brightens the drab grey of everything else!
Even the frangipani tree, which hasn't come into flower yet, is grey.
Hugh's girlfriend has come onto the scene. I think we might have to christen her, too ...